UAB “BIOVATAS” Alytus, Lithuania/ 2023
Description of work | Start | Finish | Facility |
Start-up and commissioning of the steam boiler unit GVK.13.34 GHK.13.34 EVG.13.36 of the 2.5 MWel and 12.5 MWth biofuel (wood chips) Cogeneration Power Plant at 7B Pramones St., Alytus, Lithuania. | 2023 | 2024 |
UAB “BIOVATAS” Alytus, Lithuania |

Engineering services