Alytus CHP

| Description of work | Start | End | Facility | Type of fuel |
| Analysis of the designs of the process part and APCS part of Alytus CHP biofuel-fired power unit | 2010 | 2010 | Alytus CHP (Alytus, Lithuania) | Wood chips |
| A set of start-up and commissioning works on the equipment of the 5.4 MW biofuel-fired power unit of Alytus CHP | 2010 | 2011 | ||
| Development of methodology, processing of test materials and delivery of a technical report on determination of the guarantee parameters of the thermomechanical equipment of the 5.4 MW biofuel-fired power unit of Alytus CHP | 2012 | 2012 | ||
| Development of a lining drying concept for the 12 MW hot water boiler in Alytus | 2013 | 2013 |

Engineering services