Saint Petersburg CHP-1
Description of work | Start | Finish | Facility | Type of fuel |
Design review, control over the installation of the main and auxiliary equipment, preparation of the preoperational cleaning programs for the power unit main and auxiliary equipment systems. Design review, installation control, preparation of the chemical cleaning programs for the boiler and DH equipment of the power unit. Preparation of the start-up and commissioning programs and operating instructions for the power unit equipment. Carrying out the chemical cleaning of the power unit equipment | 2014 | 2015 | Saint Petersburg CHP-1, GTP-CHP unit (hot water) (Russian Federation) | Gas |